Much more than Professional Underwater Works, dedicated to ensuring the success of all its operations and solving any situation no matter the difficulty.
Work on the La Gaviota platform inspection Jacket gaviota platform, churning wave zone, arrival of 6 “and 16” pipes to land, Arribolas beach and fixing of conductive pipes and Caissons to the structure of the Jacket “in Bermeo.