C.H Peares II
Diving, dredging and grid assembly works at C.H. Peares II Pope Gas Natural Fenosa.
Jon Rodriguez: (+34) 679 396 354 Rafael Carreira: (+34) 679 070 805
In the works of Hydraulic Works we have a long experience in repairs and maintenance in hydraulic works such as seabed protection works and repair of outfalls.
Diving, dredging and grid assembly works at C.H. Peares II Pope Gas Natural Fenosa.
Covariance Project CTM2010-19709, UPC Mooring and buoy installation work on the Coast of Badalona for the UPC, Universitat Politècnica de Catalunya.
Mooring and buoy installation work on the Badalona Coast for the UPC, Universitat Politècnica de Catalunya, COVARIANCE CTM2010-19709
Installation of Experimental Buoy (APC-PSYS System, PIPO System), in the Port of Mataro at 22 m depth.